There is a shortage of safety cones in Nebraska. There has to be because there must be at least 100,000 of them scattered along I-80 across Nebraska in at least a dozen construction zones that last for 5-10 miles each. Each zone consisted of a narrow single lane passage through cones on both sides with no noticable construction going on in any of them. The only use I can see for this construction is that is was good way to slow down the flow of traffic.
Iowa is trying to use up its quota also, but they seem to put out a few pieces of equipment here and there to simulate actual construction. It might be wise to buy stocks in the safety cone business.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment